Technical specifications for mechancial equipment and construction were initiated. The Heat Flow Diagram-Steam/Water Circuit, the Heat Balance Diagram , and the Material Balance Diagram were completed. See Exhibits 2-3, 2a4 and 2 a5. Final plant design continued through this report period. Mechanical design and detailing were brought to near completion, however, equipment arrangements were modified to agree with boiler modifications initiated by Foster Wheeler as a resultanbsp;...
Title | : | Prototype Anthracite Culm Combustion Boiler/heater Unit |
Author | : | |
Publisher | : | - 1980 |